Vinci Hair Clinic

Commercial Installation Case Study

Full M&E design & installation.

Over a period of 4 months, our team conducted the design and installation to Vinci’s new hair clinic in Manchester. Taking up the 4th floor suite, the space included a new reception, offices, consultation rooms & surgeries. Access to the site was challenging for deliveries and loading but the team worked tirelessly to get the project over the line, on time.

Works included:

  • Full design package
  • New distribution to allow for 3 phase 
  • Upgraded switchgear
  • Power & Lighting
  • Emergency lighting system 
  • Conventional fire alarm system
  • Sinks with pumped wastes & water heaters 
  • A/C alterations 
  • Electric heating