What Happens if an EICR Is Unsatisfactory Before a New Tenant?

An unsatisfactory EICR is stressful at any time. It is even more stressful when the move-in date is close.

That is because an unsatisfactory report does not just sit on the file as a warning. It means the installation has issues that need to be addressed before the landlord can feel comfortable relying on the report as part of the tenancy handover. GOV.UK’s electrical safety guidance says landlords must complete investigative or remedial work required by the report within 28 days, or within the shorter period stated in the report, and then provide the report and written confirmation of the works to the tenant and the local authority within 28 days of completion. 

What landlords need to know

If an EICR is unsatisfactory before a new tenant moves in, the key questions are:

  • what observations caused the unsatisfactory result?

     

  • what remedial or investigative work is required?

     

  • can it be completed before occupation?

     

  • is the final paperwork ready once the work is done?

GOV.UK also says landlords must provide a copy of the report to a new tenant before they occupy the premises. 

If you need that service, see Landlord EICR in Manchester.

Why “unsatisfactory” matters so much before move-in

If a tenant has not moved in yet, this is the best time to fix the problem.

Once the tenancy has started, arranging access, coordinating works and explaining delays becomes harder. That is why an unsatisfactory EICR before move-in should be treated as a priority issue, not something to tidy up casually later. 

What usually makes an EICR unsatisfactory?

An unsatisfactory report usually means the inspection identified:

  • C1 observations

     

  • C2 observations

     

  • FI observations

Those are the types of findings that take the report beyond “improvement recommended” and into “further action needed”. GOV.UK’s guidance is built around the requirement to complete remedial or further investigative work where the report requires it. 

What should happen next?

The practical sequence is usually:

  • read the report properly

     

  • identify exactly what needs doing

     

  • arrange the remedial or investigative work

     

  • obtain written confirmation from the qualified person who completed it

     

  • keep the final paperwork together

This is where landlords often lose time, not because the works are impossible, but because no one moved quickly enough once the report came back. 

Picture11

Can the tenant still move in?

This is exactly why landlords leave the EICR too late at their own risk.

If the report is unsatisfactory and the required follow-up has not been dealt with, you are no longer in the easy, “paperwork complete” stage of the tenancy setup. The safest commercial answer is to resolve the issue first and make sure the file is complete before occupation, rather than trying to push the tenancy through while the electrical position is still unresolved. GOV.UK’s guidance is clear that required remedial or investigative works have to be completed, and new tenants must receive the report before occupation. 

What records should landlords keep?

Keep:

  • the original EICR

     

  • quotes or work orders if relevant

     

  • written confirmation of remedial or investigative work

     

  • the final report pack

     

  • evidence the new tenant received the relevant paperwork

This is the difference between “we dealt with it” and “we think it got sorted”.

What is the safest next step?

If the move-in date is approaching and the EICR is unsatisfactory, the safest next step is to stop treating it as a simple certificate issue and treat it as a remedial-work issue.

That means:

  • understand the findings

     

  • book the works quickly

     

  • get written confirmation

     

  • make sure the tenancy file is complete before occupation

If you need help, see Landlord EICR in Manchester or book online here.

Final word

An unsatisfactory EICR before move-in is exactly the kind of issue that should be resolved before the tenancy starts, not normalised as “something to come back to later”. GOV.UK’s rules around remedial work, written confirmation and tenant handover make that clear, and from a practical point of view it is much easier to put the electrical position right before a tenant is already in place. 